Construction Works


Rebar Cutting, Bending, Fixing and Tying


Re-Baring and their equipment is follows,

  • Cutting – Electric Rebar Cutter, Wire Rope Cutter, Rebar Cutting Shear and Heavy-Duty Rebar Cutter
  • Bending – Electric Automatic Rebar Benders, Spiral Hoop Radial Benders.
  • Tying -Manual Rebar tying, Automatic Rebar Tying Machine.
  • Cutting, Bending and Tying Rebar (steel Concrete reinforcing bars) is often necessary when building structural reinforcement for concrete work.

Industrial Land Development:


Land Development is the Conversion of raw land into construction ready for housing, commercial, or industrial building sites. Land development process involves improvements that have indefinite life, such as draining, dredging, excavating, filling, grading, paving, etc.
Land development further includes, Road Construction, Landscaping, Service Connections to municipal services and public utilities, Drainage, Canals and External Lighting.

Shuttering (Wood & Steel) Works:


Concrete formworks (Shuttering) are required for fresh concrete constructions such as walls, slabs, beams, columns, footings, etc., Formwork in concrete construction is used as a mould for a structure in which fresh concrete is poured only to harden subsequently. Shuttering is a temporary mould to provide support to fresh concrete when placed in structural member until the concrete has set. This helps the structural member to gain sufficient strength to carry its self-load and load from other members.

Concrete Pouring:


Concrete pouring is a crucial process which not only needs properly qualified persons but also considerable focus and concentrations. We provide same procedure each time concrete installation with each property location requires its own planning.

C.C Roads:


The construction site must be carefully prepared, this includes preparing the grade or road base or road base, sub grade and sub base
The following equipment is required for the different type of concrete road construction

  • Vibratory roller
  • Shovels, spades and sieving screens
  • Concrete mixer, formwork and iron stakes
  • Watering devices, wooden hand tampers
  • Cycle pump/pneumatic air blower
  • Mild steel Sections and blocks for making joint grooves for finishing purpose

Trenches:


We are providing expertise services in pit excavation for Industrial Tank Installation, Concrete Structures like bridge footing, trenchless pipeline.
We are executing pit excavation in SPL Infra projects Pvt Ltd, Bhadravathi, Karnataka in Hard Rock and Soil Excavation for Bridge footing.

Drains:


Something (such as a pipe) that is used for removing a liquid from a place or container. At sites where alkali concentrations are high or may become very high, the ground water should be lowered by drainage so that it will not come into direct contact with the concrete.

Manholes:


A Manhole is an opening to a confined space such as a shaft, utility vault, or large vessel. Manholes are often used as an access point for an underground public utility, allowing inspection, maintenance, and system upgrades. The majority of underground services have manholes, including water, sewers, telephone, electricity, storm drains, district heating, and gas.

Pipeline Works:


A line of pipe with pumps, valves, and control devices for conveying liquids, gases, or finely divided solids. The Pipeline construction process is welding the pipe, bending the Pipe, Coating the pipeline, positioning the pipeline, installing valves and fittings and Restoring the site.

Steel structural Fabrication and Erection Works in Process plants:


Steel structures are to be designed and constructed to satisfy the design requirements with regard to stability, strength, serviceability, brittle fracture, fatigue, fire and durability. Steel fabrication process involved bending, cutting, burning or assembling metal structures and transform into desired useful machine parts, metal structure and in other components.